The list taken while the final payment is still sitting with you.
A handover inspection is measured against your contract and selections, the Guide to Standards and Tolerances 2017, the National Construction Code and ABCB Housing Provisions, and AS 3000 for the electrical clearances noted.
0 checkpoints across 0 areas on a standard Leppington pre-handover (PCI) inspection. We need the lot accessible and your builder aware an independent inspector is attending. Where a stage is not finished, the report records that rather than passing it.
Recorded at practical completion on Leppington homes.








New Construction Stage Inspections Seven checks through a Leppington build, before each stage is covered.
Defect Investigation Reports A single failure, traced back to what was required.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 for Leppington's established homes.
Building and Pest Inspections Building and timber pest in one attendance, reported separately. Instant online pricing, or talk to the booking team on 1300 471 805.
Seven, in the roof space of a single Leppington home at practical completion. Insulation is installed from above and the fittings from below, on different days by different trades, and neither sees the other's work. It is the clearest argument we have for going into the roof space at handover.
Where the window meets the Code criteria, yes, and it is a safety item rather than a finish one. We record the window, the measurement and the requirement so it cannot be waved away.
It was undersized for the roof area feeding it. A sump that cannot take the flow backs the gutter up, and in a heavy storm that water goes somewhere other than the downpipe.