Depth, diameter and cage position, confirmed while the hole is still open.
Piers turn up on Leppington lots where the footing must reach through fill or soft ground to bearing the engineer will accept. Depth is the whole exercise and it is the one dimension that cannot be checked once concrete is in the hole, so the inspection has to happen between boring and the truck.

Annotated findings from Bored piers inspections on Leppington builds. Client addresses withheld.




2Slab pre-pourThe day before the pour, steel and formwork complete
3FrameOnce frame and trusses are up and the roof is on, before lining
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
5FixingAfter mouldings, doors and joinery, before the painter
6WaterproofingAfter the membrane is applied and before any tile is laid
7Pre-handover (PCI)Two to three weeks before your handover dateInstant online pricing, or talk to the booking team on 1300 471 805.
Under an hour on a standard lot, longer where the pier count is high.
The measured depth is recorded beside the required depth. The remedy belongs to the builder and their engineer.
No. Observations go down against the engineering. Certifying is an engineer's role, and the report flags where one is required.
It can be, because concrete placed into water loses strength at the base. Recording it means it gets pumped out first.
A day is enough. Piers are often bored and filled inside two days.
The engineering for your lot, showing pier depths, diameters and locations.